Our most recent projects
Yard and playground upgrades, kitchens, amenities, emergency repairs and hardscapes, delivered while centres stay open. Our clients look to us to deliver stunning results.
Call 1300 134 933 Request a quote
The Fixed way
All projects
Childcare bathroom leak and mould repair, Logan Reserve
Urgent leak and mould repair to a Logan Reserve childcare centre bathroom, completed over a non-stop weekend so the centre stayed open on Monday.
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Childcare kitchen and yard upgrade, Point Vernon
Commercial kitchen fit-out and full outdoor yard overhaul at a Hervey Bay childcare centre, kept 100% operational and compliant throughout the works.
Childcare kitchen and staff room refurb, Nundah
Commercial kitchen upgrade and new staff room at a Nundah childcare centre, from design and council approvals through to final compliance, no fuss.
CBD office foyer ceiling upgrade, Eagle Street
After-hours foyer ceiling upgrade in a landmark Eagle Street Brisbane tower, delivered over two weekends with full marble and glass protection.
Childcare centre yard upgrade, Dalby
Four-stage outdoor play area overhaul at a Dalby childcare centre, delivered in four weeks while the centre stayed open and compliant.
Childcare verandah replacement, Booval
Full structural replacement of a deteriorated 165 m² elevated verandah at a Booval childcare centre, done after hours over one weekend to avoid closure.
Childcare deck replacement, Warwick
Removal and replacement of a deteriorated deck and its structural frame at a Warwick childcare centre, completed in a strict 48-hour weekend window.
Custom sandstone sandpit for childcare, Mackay
A custom sandstone sandpit for a Mackay childcare centre, dug by hand with no machine access and finished in one weekend, drained and ready by Monday.
Childcare driveway and carpark upgrade, Daisy Hill
A 300 m² asphalt carpark and driveway rebuilt at a Daisy Hill childcare centre over the Easter break, with little to no disruption to families.
Childcare synthetic grass conversion, Gatton
A dirt bowl turned into a synthetic grass play area at a Gatton childcare centre, hand-prepared with new concrete plinths, on time and on budget.
Childcare centre flood recovery, Crestmead
Emergency flood repairs at a Crestmead early learning centre: crews on site within 4 hours over Christmas, and the centre reopened for term.
Mercure Brisbane restaurant and bar fit-out
Restaurant and bar fit-out at the Mercure Brisbane delivered in a three-week lead time with in-house joinery, a DALI lighting system and an operable wall.
Mercure Brisbane laneway, Chelsea Lane
A taxi and bus drop-off laneway at the Mercure Brisbane turned into Chelsea Lane, an all-weather alfresco function space for up to 120 people, in a four-week turnaround.
The Sebel Brisbane, Croft House restaurant fit-out
Complete de-fit and refurbishment of Croft House at The Sebel Brisbane: feature marble, custom timber rafters and a new street-side coffee bar on a restricted site.
No projects of that type yet. Call 1300 134 933 or mobile 0404 501 501 and ask us about it.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.