Childcare centre yard upgrade, Dalby
Four-stage outdoor play area overhaul at a Dalby childcare centre, delivered in four weeks while the centre stayed open and compliant.
Fixed was engaged to complete a multi-zone external overhaul in a remote region with major local supply and labour shortages, all while keeping the facility 100% operational and compliant. Delivered across four meticulously planned stages over four weeks, our team worked around the clock, 7 days a week including after hours, to completely transform the outdoor play area. By freighting specialised, compliant products directly from Brisbane and deploying two rotating trade teams, we met a compressed deadline with zero downtime or compliance disruptions for the client.
The scope of works
The complete external overhaul focused on maximising safety, aesthetic appeal and structural durability: 480 m² of premium synthetic turf, 180 linear metres of compliant Colorbond fencing, structural sandstone sandpits with professional paving, and new commercial-grade shade sails with impact-attenuation zones underneath.
The constraints and our solutions
To ensure the facility could safely remain open to children and staff every day, we divided the yard into four distinct construction stages. The remote location lacked local suppliers capable of providing the specialised, certified safety products required, so we coordinated the transport and freight of all major materials ex Brisbane directly to site. With tight project dates and a local trade shortage resistant to weekend and after-hours work, we mobilised two separate, highly specialised trade teams from Brisbane, rotating on a 7-day-a-week schedule to hit every milestone without compromise.
The result
The project was completed in just 4 weeks. Thanks to a rigorous logistics strategy and an unwavering commitment to out-of-hours labour, the facility enjoyed a smooth transition to a world-class outdoor environment. The management team was able to focus entirely on their daily operations, secure in the knowledge that their compliance was protected and the job was being executed safely, swiftly and without fuss.
Project features
- 480 m² of premium synthetic turf installed to provide a durable, low-maintenance, vibrant play surface.
- Supply and installation of 180 linear metres of secure, compliant Colorbond fencing.
- Structural sandstone sandpits paired with professional paving to create distinct, tactile play zones.
- New commercial-grade shade sails combined with specialised impact-attenuation zones underneath for fall-safety compliance.
- The yard divided into four construction stages so the centre kept its operational capacity and safety compliance throughout.
- All specialised, certified products freighted directly from Brisbane to the remote site.
- Two dedicated trade teams from Brisbane on a rotating 7-day schedule to beat the local trade shortage.
Before and after


Outdoor play area overhaul
Project photos
More projects
All projects
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Childcare kitchen and yard upgrade, Point Vernon
Commercial kitchen fit-out and full outdoor yard overhaul at a Hervey Bay childcare centre, kept 100% operational and compliant throughout the works.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.