Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Executing complex facility upgrades in remote locations requires meticulous logistics and absolute adaptability. For this project, Fixed was tasked with delivering a critical infrastructure upgrade at a regional centre, with the strict condition that the facility must remain fully functional for the community throughout the construction process.
To eliminate any risk to the public and staff, our team deployed on a Sunday to establish a comprehensive safety perimeter. By engineering zoning and installing high-standard safety fencing before the standard week commenced, we ensured the centre could operate with absolutely zero safety breaches or disruptions. Maintaining a safe live environment required constant communication; our project manager maintained continual liaison with the Centre Director to ensure smooth site coordination.
As with many complex refurbishments, unexpected site conditions tested the project’s timeline. During excavation, our team uncovered a concealed, severely rotted structural retaining wall that posed an immediate safety hazard. While other contractors would stall for contract variations or pause the timeline, Fixed immediately pivoted. We engineered a rapid, compliant replacement solution on the spot, absorbing the extra workload without a single day of delay.
Faced with both structural surprises and a turn in the weather, our team pushed through heavy rain and worked extended hours to keep the project on track. True to our reputation, we absorbed every physical and environmental constraint to deliver a premium, fully compliant result: on time, on budget, and completely without fuss.
Project features
- Coordinated workforce mobilisation, material staging and delivery in a remote regional location.
- Strategically set up site zoning and safety fencing on a Sunday, allowing the centre to remain fully operational during the week with zero safety issues.
- Maintained continual, direct liaison with the Centre Director to guarantee absolute safety compliance and zero operational disruption.
- Discovered a severely rotted, unmapped retaining wall during works and immediately engineered a structural solution to keep the project moving without delay.
- Pushed through heavy rain and committed to extended working hours to guarantee the project crossed the finish line on schedule.
- Safely managed physical constraints and unexpected site discoveries to bring the project in completely on time and on budget.
Before and after


Security fencing upgrade
Project photos
More projects
All projects
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Childcare kitchen and yard upgrade, Point Vernon
Commercial kitchen fit-out and full outdoor yard overhaul at a Hervey Bay childcare centre, kept 100% operational and compliant throughout the works.
Childcare kitchen and staff room refurb, Nundah
Commercial kitchen upgrade and new staff room at a Nundah childcare centre, from design and council approvals through to final compliance, no fuss.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.