Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Tackling structural failures on a massive scale requires an elite level of project orchestration, specialised trades, and a relentless commitment to site compliance. Fixed was called upon to execute the emergency repair and reconstruction of a failing 2.4 m high, 80-metre-long timber retaining wall that had reached the end of its 30-year lifespan. Left unchecked, the slipping structure posed an immediate threat to the structural integrity of the surrounding ground and adjoining houses situated directly on the boundary line.
The physical constraints of this project were monumental. With zero access for traditional excavating machinery, our teams had to pioneer a purely non-destructive, manual approach. We utilised high-powered vacuum excavation over 11 intensive days to sink foundation holes over 2 metres deep. To combat dangerous working conditions and prevent localised land slips, custom shoring systems were engineered and installed to protect the site workforce and secure the foundations.
Material handling demanded immense physical stamina. Because machinery couldn’t reach the wall zone, every single concrete sleeper and structural steel post had to be walked into position entirely by hand, utilising dedicated 3-person teams. Pouring the foundations required pumping over 45 m³ of concrete through specialised line pumps across extended distances. Given the extreme hazards and around-the-clock pressure, we operated under out-of-hours work permits with zero days off for 3 weeks, deploying a two-team rotation strategy to strictly manage trade fatigue.
What sets Fixed apart is our ability to bring a massive network of specialised trades under a single umbrella. We brought together and orchestrated engineers, safety consultants, plumbers, carpenters, vacuum excavation contractors, concrete pump operators and landscapers to fully restore and make good to the neighbouring residential properties. We engaged an independent safety auditor before and during the works to ensure flawless compliance. For the client, the experience was entirely hands-off: we supplied every consultant and engineering sign-off required, allowing them to step back with total peace of mind until we notified them that the impossible task was completely FIXED.
Project features
- Stabilised and completely rebuilt a failing, 30-year-old structural timber retaining wall measuring 2.4 m high by 80 linear metres long.
- Overcame zero-access constraints by utilising specialised vacuum excavation over 11 days to dig precise foundation piers over 2 metres deep.
- Utilised custom-engineered structural shoring to eliminate soil collapse risks and protect adjoining residential properties on the boundary.
- Brought together an extensive network of specialised trades under one umbrella, including engineers, plumbers, carpenters, safety consultants and landscapers.
- Operated for 3 weeks straight with no days off using out-of-hours work permits, deploying two distinct teams to safely mitigate fatigue in dangerous conditions.
- Hand-walked all structural posts and sleepers into position using 3-person handling teams and placed over 45 m³ of concrete via specialised line pumps.
- Supplied all engineering, council compliance and active safety auditing, offering the client a completely hands-off, zero-fuss experience.
Before and after


80 m retaining wall rebuild
Project photos
More projects
All projects
Childcare bathroom leak and mould repair, Logan Reserve
Urgent leak and mould repair to a Logan Reserve childcare centre bathroom, completed over a non-stop weekend so the centre stayed open on Monday.
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare centre yard upgrade, Dalby
Four-stage outdoor play area overhaul at a Dalby childcare centre, delivered in four weeks while the centre stayed open and compliant.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.