Childcare bathroom leak and mould repair, Logan Reserve
Urgent leak and mould repair to a Logan Reserve childcare centre bathroom, completed over a non-stop weekend so the centre stayed open on Monday.
In high-occupancy early learning environments, maintaining functional, sanitary amenities is absolutely critical. Facing an active leak that had led to rapid mould accumulation, this childcare facility required immediate intervention to protect the health of the children and prevent a total operational shutdown of their bathroom spaces.
To ensure the centre remained fully functional during standard hours, Fixed orchestrated an aggressive, non-stop weekend execution strategy. Our project management team rapidly mobilised multiple trades to work concurrently over a compressed 48-hour period. Starting late Friday, our team stripped out the contaminated wall linings, isolated and repaired the failed plumbing lines, and completed an extensive, certified mould remediation to ensure a completely safe and sterile environment.
Rebuilding the space on such a tight deadline required incredible supplier agility. Utilising our vast, long-standing network of trusted trade suppliers, we managed to have a custom stainless steel plumbing trough engineered, fabricated and delivered to the site on an unprecedented 24 hours’ notice. Our carpentry, plumbing and finishing teams worked through the weekend to integrate the new trough, replace the wall substrates, and complete all waterproofing and matching finishes.
True to the Fixed philosophy, the entire high-stakes project was completed with zero variations, zero hidden costs and absolutely no issues. By Monday morning, the facility’s director and staff walked into a beautifully reinstated, pristine bathroom, completely eliminating any disruption to the children’s daily routines.
Project features
- Rapidly coordinated and managed a diverse team of specialised trades to demolish, remediate and rebuild an entire bathroom space over a single weekend.
- Sourced, engineered and delivered a custom-made stainless steel trough on just 24 hours' notice, a feat made possible only by our extensive, trusted supplier network.
- Reinstated the amenities completely ahead of the Monday morning drop-off, ensuring no interruption to the centre's daily programs or child comfort.
- Delivered a high-speed emergency project with zero variations, zero issues and a highly satisfied client.
Before and after


Weekend bathroom rebuild
Project photos
More projects
All projects
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Childcare verandah replacement, Booval
Full structural replacement of a deteriorated 165 m² elevated verandah at a Booval childcare centre, done after hours over one weekend to avoid closure.
Childcare deck replacement, Warwick
Removal and replacement of a deteriorated deck and its structural frame at a Warwick childcare centre, completed in a strict 48-hour weekend window.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.