Childcare deck replacement, Warwick
Removal and replacement of a deteriorated deck and its structural frame at a Warwick childcare centre, completed in a strict 48-hour weekend window.
Our team was called in to tackle the complete removal and replacement of a severely deteriorated deck and its underlying structural framework. The project demanded flawless execution within a strict 48-hour weekend window.
Because of the site’s unique logistical challenges and limited local material availability, precision planning was critical. We coordinated and staged all specialised decking materials on site two weeks prior to kicking off construction. Additionally, to minimise disruption in a tightly regulated area, our team managed all necessary compliance and secured after-hours permits to work through the night. This highly labour-intensive project required top-tier craftsmanship and close coordination, proving once again that we can deliver complex upgrades on time, under pressure, and entirely without fuss.
Project features
- Pre-ordered and staged all materials two weeks in advance to overcome local supply limitations.
- Complete structural demolition and replacement executed entirely over a single weekend to eliminate operational downtime.
- Handled after-hours permit approvals to execute high-intensity work within strict community guidelines.
- Deployed a highly skilled team for intensive labour to guarantee long-term structural integrity and a premium finish.
Before and after


Deck and frame replacement
Project photos
More projects
All projects
Childcare bathroom leak and mould repair, Logan Reserve
Urgent leak and mould repair to a Logan Reserve childcare centre bathroom, completed over a non-stop weekend so the centre stayed open on Monday.
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.