Childcare kitchen and staff room refurb, Nundah
Commercial kitchen upgrade and new staff room at a Nundah childcare centre, from design and council approvals through to final compliance, no fuss.
When a busy local centre required a complete commercial kitchen upgrade and a new staff room, Fixed stepped in to manage the project from initial concept to final compliance.
The preliminary phase required navigating a rigorous 7-week design and approval process. Dealing with multiple consultants, structural engineers and council authorities presented significant bureaucratic hurdles. True to our “no fuss” philosophy, our team managed these complex negotiations entirely in the background, shielding the client from the administrative burden so they could focus on their day-to-day operations.
Once approvals were secured, the physical transformation began. The project involved stripping back the existing space to install all-new walls, commercial-grade flooring, and comprehensive plumbing and electrical upgrades. Because the centre could not afford to close, we set up a fully compliant, temporary sandwich preparation area, ensuring daily operations continued safely alongside our construction zone.
The final phase required a massive push, completing the entire commercial installation in a remarkably tight 9-day window. The result is a premium, high-capacity commercial kitchen and a dedicated staff room built to the highest standards.
Project features
- Completed the entire physical fit-out, including structural and services upgrades, in just 9 days.
- Designed and maintained temporary food preparation facilities so the centre could remain fully operational throughout construction.
- Installed bespoke custom stainless steel benching and a high-capacity commercial range hood.
- Executed comprehensive new partitioning, commercial-grade safety flooring, and completely new plumbing and electrical infrastructure.
Before and after


Commercial kitchen upgrade
Project photos
More projects
All projects
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare kitchen and yard upgrade, Point Vernon
Commercial kitchen fit-out and full outdoor yard overhaul at a Hervey Bay childcare centre, kept 100% operational and compliant throughout the works.
Childcare centre yard upgrade, Dalby
Four-stage outdoor play area overhaul at a Dalby childcare centre, delivered in four weeks while the centre stayed open and compliant.
Ready to experience the Fixed way?
Drop us a line today. Our phone is always on.