A 300 m² asphalt carpark and driveway rebuilt at a Daisy Hill childcare centre over the Easter break, with little to no disruption to families.
When a busy facility needed to completely overhaul its deteriorating 300 m² asphalt carpark and driveway, minimising operational downtime was the primary directive. Our team stepped in to manage the complex civil project from end to end, strategically scheduling the heavy works over the Easter holiday period to ensure the centre experienced little to no disruption.
The scope required a complete structural transformation. In the first two days alone, our teams efficiently excavated and disposed of over 125 tonnes of spoils from the site. To ensure the new surface could effortlessly withstand continuous heavy vehicle and truck traffic, we installed robust steel reinforcing paired with a high-strength 150 mm thick, 32 MPa concrete slab. The project was rounded out with a comprehensive civil finish, including the supply and installation of integrated drainage systems, concrete kerbing, speed bumps and high-visibility line marking.
Executing large-scale civil works in a confined footprint is challenging enough, but this project was further complicated by its immediate surroundings: a dense, quiet residential neighbourhood. Navigating this required meticulous logistics and stakeholder management. Our team proactively managed traffic control to keep local roads safe and secured council permits to allow for extended, after-hours operational windows.
Despite encountering a window of poor weather, our crews pushed through around the clock. Originally slated as a 12-day project, our project management and relentless work ethic allowed us to deliver the fully completed, compliant and ready-to-use asset in just 11 days.
Project features
- Large-scale, heavy-duty civil and structural works.
- Successfully managed a massive logistical operation, including the removal of 125 tonnes of spoils, within a highly confined footprint.
- Navigated strict council regulations in a built-up domestic neighbourhood, securing the necessary after-hours permits and implementing rigorous traffic management.
- Overcame unexpected bad weather and an aggressive schedule to deliver the project a full day ahead of the 12-day deadline, with zero operational downtime.
Project photos
More projects
All projects
Childcare security fencing upgrade, Beak Street, Gladstone
Security fencing upgrade at a regional Gladstone centre on Beak Street, delivered with a full safety perimeter so the facility stayed open throughout.
Childcare retaining wall rebuild, Robina
Emergency reconstruction of a failing 2.4 m high, 80 m long timber retaining wall at a Robina childcare centre, delivered safely and fully compliant.
Childcare kitchen and yard upgrade, Point Vernon
Commercial kitchen fit-out and full outdoor yard overhaul at a Hervey Bay childcare centre, kept 100% operational and compliant throughout the works.