Quay West Suites

Melbourne, VIC

Suite Refurb

Our clients look to us to deliver stunning results. The following Before and After images show the Fixed approach to a full refurb of the Quay West Suites Melbourne.

90 rooms were refurbished in total. We achieved 19 rooms per stage with each stage taking only 3.5 weeks from start to finish. The rooms were complete over two floors per stage.

The hotel was still operational during construction and the disruption was minimal. The common comment from management and guests was: “I didn’t even know there was a refurb going on.”

A great result from our committed team and thanks to the Hotel for letting us streamline this project without fuss!

Quay West Suites

Melbourne, VIC

Function Space

A key element of our client’s brief was versatility, requiring a function space for multiple event types and varying capacities. Fixed worked with the client to design a space that caters for both small and large groups, incorporating innovative building products to achieve maximum flexibility. Working with the client’s delivery and budget timeframes, we designed a refit solution that made use of many existing fittings, minimising unnecessary cost whilst creating a classy new function space.

Project Features

  • Delivered in 1 week to coordinate with function room availability and to ensure no bookings were impacted

  • Sourced, engineered and installed Laminex Clipwall, the first of its kind in Melbourne

  • Installation of operable wall to allow seating up to 160 people

  • Made use of existing fittings with clever techniques to minimize budget spend